Rte. 128/I-95 between Gloucester and WestonCURRENT CONDITIONS | |
Rte. 128 North (I-95 to Gloucester) Bridge maintenance operations on Annisquam River Br. Lanes restricted. One lane open for travel. Expect delays. Right lane closed before Exit 23: Rte. 35. Heavy congestion. Work crew. Stay left. Road construction during the day time at Exit 23: Rte. 35. Right lane closed. Stay left. Road construction during the night from Exit 29: I-95 to Exit 28: Centennial Dr. Left lanes closed. Closures of various ramps also expected. Expect delays. | |
Rte. 128 South (Gloucester to I- 95) Bridge maintenance operations on Annisquam River Br. Lanes restricted. One lane open for travel. Expect delays. Road construction during the day time from Exit 22: Rte. 62 to Exit 23: Rte. 35. Right lane closed. Stay left. Road construction during the night from Exit 28: Centennial Dr to Exit 29: I-95. Left lanes closed. Closures of various ramps also expected. Expect delays. | |
Rte. 128/I-95 North (I-93 to I-95) Road construction during the night from Exit 43: Walnut St to Exit 45: I-95. Left lanes closed. Closures of various ramps also expected. Expect delays. | |
Rte. 128/I-95 North (Mass Pike/I-90 to Rte. 3) Bridge maintenance operations after Exit 30: Rte. 2A - Hanscom Field. (Mass Avenue overpass). Left lane closed. Stay right. Road construction during the night at Exit 27: Winter St. - Totten Pond Rd. Road closed. All traffic diverted to the Exit 27A off-ramp to Wyman Street and back on the highway at the Exit 27B on-ramp. Follow detour. Road construction during the night from Exit 25: Mass Pike/I-90 to Exit 26: Rte. 20. Right lane closed. Stay left. | |
Rte. 128/I-95 North (Rte. 3 to I-93) | |
Rte. 128/I-95 South (I-93 to Rte. 3) Road construction during the night from Exit 37: I-93 to Exit 35: Rte. 38. Left lanes closed. Stay right. | |
Rte. 128/I-95 South (I-95 to I-93) Road construction during the night from Exit 38: Rte. 28 to Exit 37: I-93. Left lanes closed. Stay right. Road construction during the night from Exit 45: I-95 to Exit 43: Walnut St. Left lanes closed. Closures of various ramps also expected. Expect delays. | |
Rte. 128/I-95 South (Rte. 3 to Mass Pike/I-90) Bridge maintenance operations after Exit 31: Rte. 4/225. (Mass Avenue overpass). Left lane closed. Stay right. Road construction during the night from Exit 26: Rte. 20 to Exit 25: Mass Pike/I-90. Right lane closed. Stay left. | |
Current Travel Times: Northbound: 55 minutes Southbound: 48 minutes |